Laserfiche WebLink
Both of the gullies are repaired and stabilized. <br />5. Submit to the Division a complete Technical Revision detailing methods that will be <br />immediately implemented to reduce peak flow into the Prospect Pond from storm events. <br />These methods have been discussed in detail in the Permit Renewal OS correspondence. <br />Colowyo is currently seeking vacation of NOV CV- 2008 -004. An assessment <br />conference has been scheduled for the seventh of November and pending the <br />outcome of that meeting, Colowyo will then address this remedial action. <br />Please contact me at (970) 824 -1529 if you have any questions or need any additional <br />information. <br />Sincerely, <br />fifer *Sekulski <br />Environmental Engineer <br />cc: 17.6.6 NOV- 2008 -004 <br />