My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-15_HYDROLOGY - M1997054
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1997054
>
2008-10-15_HYDROLOGY - M1997054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:09 PM
Creation date
10/16/2008 11:35:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
HYDROLOGY
Doc Date
10/15/2008
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table-3 <br />Front Range Aggregates, LLC <br />Parkdale Project M-97-054 <br />Substitute Supply Plan - Summary <br />Applegate <br />Group, ice. <br />Prepared By: Michelle Hatcher <br />Date: April 24, 2008 <br />Job #: 05-129 <br /> <br />161 <br /> <br /> <br /> <br />onth Ill <br />Total <br />Evaporative <br />Loss <br />(ac-ft) k10 <br />Operational <br />Loss <br />(ac-ft) 11 <br />Total <br />Stream <br />Depletions <br />(ac-ft) <br />Lagged <br />Total <br />Stream <br />Depletions <br />(ac-ft) <br />Releases from <br />Clear Creek <br />Reservoir <br />(ac-ft) <br />Potential Releases <br />from Twin Lakes <br />Reservoir <br />(ac-ft) <br />May-08 <br />Jun-08 <br />Jul-08 0.6 <br />0.8 <br />0.7 3.7 <br />3.7 <br />3.7 4.3 <br />4.5 <br />4.5 3.3 <br />3.7 <br />4.1 3.5 <br />3.9 <br />4.3 3.5 <br />3.9 <br />4.3 <br />Aug-08 0.6 3.7 4.4 4.2 4.5 4.5 <br />4 <br />4 <br />Sep-08 0.5 3.7 4.2 4.1 4.4 . <br />4 <br />4 <br />Oct-08 0.4 3.4 3.8 4.2 4.4 . <br />9 <br />3 <br />Nov-08 0.2 2.7 2.8 3.7 3.9 . <br />7 <br />3 <br />Dec-08 0.1 2.7 2.8 3.4 3.6 . <br />Jan-09 <br />Feb-09 0.1 <br />0.2 2.7 <br />2.7 2.8 <br />2.8 3.2 <br />2.8 3.4 <br />3.0 <br />3 3.4 <br />3.0 <br />3 <br />3 <br />Mar-09 0.2 2.7 2.9 3.1 3. . <br />Total 4.5 35.3 39.8 39.8 42.3 42.3 <br />pr_ 1 3.3 3.3 <br />8 <br />3 <br />May-09 0.6 3.7 4.3 3.6 3.8 . <br />4 <br />1 <br />Jun-09 0.8 3.7 4.5 3.8 4.1 <br />4 <br />5 . <br />4 <br />5 <br />Jul-09 0.7 3.7 4.5 4.2 . . <br />Aug-09 0.6 3.7 4.4 4.3 4.5 4.5 <br />4 <br />4 <br />Sep-09 0.5 3.7 4.2 4.2 4.4 . <br />4 <br />5 <br />Oct-09 0.4 3.4 3.8 4.2 4.5 . <br />4 <br />0 <br />Nov-09 0.2 2.7 2.8 3.7 3.9 . <br /> 7 <br />3 <br />Dec-09 0.1 2.7 2.8 3.4 3.7 . <br />Jan-10 0.1 2.7 2.8 3.2 3.4 3.4 <br />Feb-10 0.2 2.7 2.8 2.8 3.0 3.0 <br />Mar-10 0.2 2.7 2.9 3.1 3.3 3.3 <br />Total 5.0 38.7 43.6 43.6 46.4 46.5 <br />Notes <br />(1) from Table-1 <br />(2) from Table-2 <br />(3) Total Stream Depletions = Total Evaporative Loss + Total Operational Loss <br />(4) Lagged Total Stream Depletions based on Glover techniques <br />(5) Releases from Clear Creek Res. include a 0.07% ditch loss for 90.6 river miles from the reservoir to the Parkdale mining site. <br />(6) Releases from Twin Lakes Res. include a 0.07% ditch loss for 93.5 river miles from the reservoir to the Parkdale mining site. Front Range <br />Aggregates will only be utilizing this source for water if releases cannot be made from Clear Creek Reservoir.
The URL can be used to link to this page
Your browser does not support the video tag.