My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-15_HYDROLOGY - M1999050
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999050
>
2008-10-15_HYDROLOGY - M1999050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:09 PM
Creation date
10/16/2008 11:35:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
HYDROLOGY
Doc Date
10/15/2008
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> <br />MONTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br /> <br /> CONNELL RESOU RCES INC. CO MBINED PLAN-ST UTE PIT TIMNATH-CONNELL PIT <br /> <br /> <br /> <br /> ACCRETIONS& FARM HEADGATE LAGGED ACCRETIONS MONTHLY <br /> TIMNATH TOTAL DEPLETIONS DELIVERY FROM RECHARGE SUMMER WINTER EXCESS <br /> STUTE PIT CONNELL PIT LAGGED FROM OF 2 BOX ELDER OF BOX ELDER RETURN RETURN OR DEFICIT <br />MONTH LAGGED LAGGED COMBINED 2 BOX ELDER SHARES INTO SHARES ACCRUING FLOW FLOW REALIZED <br /> DEPLETIONS DEPLETIONS DEPLETIONS SHARES RECHARGE TO THE RIVER OBLIGATION OBLIGATION AT RIVER <br /> (AF) (AF) (AF) (AF) (AF) (AF) (AF) AF (AF) <br /> (1) (2) (3) (4) (5) 6) (7 (8) (9) <br />NOVEMBER (08) 0.13 1.82 1.95 -7.05 0.36 21.14 7.40 11.79 <br />DECEMBER(08) 0.12 1.24 1.36 -6.79 19.10 6.79 10.95 <br />JANUARY(09) 0.11 1.07 1.18 -6.14 17.37 6.14 10.05 <br />FEBRUARY(09) 0.10 1.18 1.28 -5.56 15.84 5.56 9.00 <br />MARCH(09) 0.09 1.63 1.72 -5.02 14.46 5.02 7.72 <br />APRIL(09) 0.08 2.38 2.46 -2.89 2.32 13.83 5.21 6.16 <br />MAY 09) 0.07 3.11 3.18 14.64 25.56 18.41 10.92 4.31 <br />JUNE(09) 0.07 4.12 4.19 24.98 36.53 24.96 11.55 9:22 <br />JULY(09) 0.06 4.73 4.79 43.65 58.54 25.39 14.90 5.70 <br />AUGUST(09) 0.05 4.58 4.63 30.65 44.47 23.11 13.82 4.66 <br />SEPTEMBER(09) 0.05 3.56 3.61 8.89 20.16 20.96 11.27 6.08 <br />OCTOBER(09) 0.04 2.65 2.69 -4.00 4.64 19.18 8.64 7.85 <br />TOTAL 0.97 32.07 33.04 85.36 192.58 233.75 62.46 44.76 <br /> <br /> <br /> <br />(1) Total lagged post-pumping depletions at the Stute pit <br />(2)Total lagged mining depletions which reflect existing conditions at the Timanth-Connel l Pit (including eva oration from the recharge pond) <br />(3)Total combined lagged depletions (1)+(2) <br />(4)Accretions and depletions to river from 2 Box Elder Ditch shares <br />(5) Farm Headgate delivery from 2 Box Elder Ditch shares into the recharge pit during the irrigation season <br />(6) Lagged accretions from recharge of the Box Elder shares accruing to the river <br />(7) Summer Return flow obligation for the 2 shares that will be maintained in their historic pattern b the recharge program <br />(8) Winter Return flow obligation for the 2 shares that will be maintained in their historic pattern by the recharge pro ram <br />(9) Monthly excess and deficit real ized at the river, (6)-(3)-(7)-(8) <br /> <br /> <br /> <br /> <br /> <br />Connell Resources, Inc. combined monthly distribution and replacements (08-09)
The URL can be used to link to this page
Your browser does not support the video tag.