Mr. Richard Raines Page 5 <br />G.L. Pit Substitute Water Supply Plan (DRMS# M-81-022) <br />October 7, 2008 <br />Table I <br />G.L. Pit (DRMS # M-81-022) <br />MONTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br />(All Values in Acre-Feet) <br /> Lagged Evaporative Transit Total <br />Month Depletions including losses from Replacement <br /> post-pumping Eaton Requirement from <br /> depletions Reservoir Tri-Districts lease <br />Nov-08 0.53 0.04 0.57 <br />Dec-08 0.51 0.04 0.55 <br />Jan-09 0.50 0.04 0.54 <br />Febr-09 0.58 0.04 0.62 <br />Mar-09 0.69 0.05 0.74 <br />Apr-09 0.95 0.07 1.02 <br />May-09 1.22 0.10 1.32 <br />Jun-09 1.30 0.10 1.40 <br />Jul-09 1.18 0.09 1.27 <br />Aug-09 0.96 0.07 1.03 <br />Sept-09 0.74 0.06 0.80 <br />Oct-09 0.60 0 <br />65 <br /> 0.05 . <br />Total 9.8 0.8 10.5 <br />Note: The transbasin Sand Creek Ditch water is transported over Boulder Ridge in the Wilson <br />Ditch and Stored in Eaton Reservoir. Releases made from Eaton Reservoir travel <br />approximately 50 miles to the mouth of the Poudre Canyon therefore, a 7.8 percent transit <br />loss was included in the total replacement water.