Laserfiche WebLink
VOLUME III <br />• <br />LIST OF FIGURES -CONTINUED <br /> 6t Cross-Section Confluence of Middle and Foidel Creeks <br /> 7 Typical Mine Section <br /> 7a 1994 Development Drillhole Location <br /> 7b Preparation Plant Material Temporary Stockpile Location <br /> 8 Leachate Concentration, Energy Mine No. 1 <br /> 9 Predicted Leachate Concentration, Energy Mine No. 1 <br /> 10 Leachate Chemistry, Energy Mine No. 1 <br /> 11 Predictive Analysis -TDS Concentrations after 50 Years <br /> l la Existing Railroad Cross-Sections <br /> l lb Railroad Track Extension, Cross-Section, Typical Cut <br /> l lc Preparation Plant. Topsoil and Plant Growth Media Stockpile Location <br /> l ld Wadge Overburden Potentiometric Surface &TDS Concentrations <br /> 12 Design of Typical Contour Furrow <br /> 12a We11006-BRDH-7, Period of Record Water Level Data <br />• 13 Predictive Analysis after Five Years of Mining <br /> 13a Pond E Aerator <br /> 14 Typical Subsidence Monument <br /> 15 Typical Portal Seals <br /> 16 Rock Dust Bin Operations Design <br /> 16a Southwest Mining District Ventilation Borehole and Access Road Location <br /> 16a(1) Southwest Mining District Gate-Roads, Bleeder, and Drainage Rooms <br /> 16b Gate-Road Extension Area <br /> 16c 9 & 10 Right Gateroad Extensions <br /> 16d 1995 Seismic Lines -EMD <br /> 16e EMD Bleeder Shaft Grading Plan <br /> 16e(1) EMD Bleeder Shaft Site Plan <br /> 16f EMD Ventilation Site and Panel Description <br /> 16g Section 14 Mining Area: Structures & Renewable Resources <br /> 16h 8 Right Inby <br /> 16h(1) 6 Right & 7 Right Irby Development <br />. 16i 1996 Seismic Lines and Mine Water Return Line <br />MR08-228 xv 03/06/08 <br />