Laserfiche WebLink
VOLUME II-E <br />• LIST OF EXHIBITS <br /> 42A EMD Alluvial Valley Floor Determination <br /> 43 U.S. Fish and Wildlife Service: Windy Gap Process <br /> 44 NPDES Permit CO-0042161 <br /> 45 Fish Creek AVS/Stream Study: Hydrologic Analysis (Confidential Appendix) <br /> 46 Fish Creek AVS/Stream Study: Vegetation Analysis <br /> 47 Ownership and Control Information Update <br /> 47A Prior Affiliation History for Nicholas P. Moros, Vice President <br /> 47B Prior Affiliation History for Garold R. Spindler, Senior Vice President <br /> 47C Prior Affiliation History for Susan E. Chetlin, Assistant Secretary <br /> 47D Prior Affiliation History for Kevin S. Crutchfield, Senior Vice President, Midwest Region <br /> 47E Prior Affiliation History for Thomas V. Falkie, Director <br /> 47F Prior Affiliation History for Pat Panzarino, VP, Sales & Marketing <br /> 48 Haul Road for Batchway <br /> 48-1 Batch Weigh Loadout Haul Road, Alternative Gravel Section/Construction Recommendations <br /> 48-2 Batch Weigh Loadout Haul Road, Modified Gravel Section/Construction Recommendations <br /> 48-3 Main Entrance Road and Parking Lot, Pavement Recommendations <br /> 49A 6-North Mains Intake Shaft -Design Drawings <br /> 49B Bathhouse Expansion Design Drawings <br /> 49C 18-Right Escape Hoist Foundation Drawings <br /> 49D Conveyor Support Structure and Foundation Drawings <br /> 49E 6-North Mains Substation Design Drawings and Materials List <br /> 49F Pumphouse Addition Design Drawings and Contractor Specifications <br /> 49G Electro-Coagulation System Design Drawings and Contractor Specifications <br /> 49H Truck Loadout Design Drawings <br /> 49I Temporary Haulroad C-1 Profile and Typical Cross-Section <br /> 49J Haulroad A -Design Information <br />• <br />TR07-61 xi 07/14/07 <br />