Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 1211-CO-09-01370-01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />DATE/TIME: y 2 <br />INSPECTOR SIGNATURE: <br />INSPECTOR TITLE: En I S ?C c <br />Under the supervision of Michael W. Lu low, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />Stability of fill (quarterly inspection) <br />B. Critical construction periods: <br />1. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />0 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />T <br />0 file:I:\EN\ENVIRONMENTAL\EMPIRE\INSPREP\WASTEPILEFORM.DOC <br />5. Revegetation