Laserfiche WebLink
I • the condition of the opening and the grating. The openings will be fenced and signs posted <br />identifying the hazardous nature of the openings. <br />RS-1 and RS-2 were filled in 2003 in response to a heating incident within the gob. Incombustible <br />fll material was harrowed from the pad of RS-2 to fill both shafts. RS-1 pad was recontoured and <br />seeded that fall. The fill material from RS-2 is being replaced by material generated from the <br />recontouring of the Couniy Road 65 -Haul Road intersection. Approximately 440 cubic yards of <br />this material is being hauled to RS-2 to restore the contour for reclamation. Additional material will <br />be hauled from this intersection to RS-3 to expedite final plugging at a later date. <br />• <br />L~ <br />MR 126 (4/2004) V-1&4 <br />