Laserfiche WebLink
40CFR3460, published in the Federal Reoister July 19, 1979, would be addressed by <br />OSM and CMLRD (now DMG) in the Technical Environmental Assessment. OSM or <br />CMLRD did not designate any area unsuitable for mining within the permit area. <br />2.03.7(2) Not Applicable <br />2.03.7(3) Not Applicable <br />2.03.8 Permit Term Information <br />The starting date for the construction activities to begin development of the mine <br />was July, 1981. Coal shipment began in the first quarter of 1984. The mine has <br />enough coal reserves to last for about 20 years at the current rate of mining. More <br />detailed information is given in Section III, Mine Description and Section IV, Mine <br />Surface Facilities Operation Plan. <br />2.03.9 Personal Injury and Property Damage Insurance Information <br />The information is included as Exhibit I-4 <br />2.03.10 Identification of Other Licenses and Permits <br />A list of current licenses and permits by type, name and address of issuing authority, <br />identification number and approval date is given below; <br />(1) Air Emission Permit <br />No.12R6802-1 F issued on April 15, 1998 (Emergency Stockpile) <br />No. 12RB802-2 issued on December 29, 2003 (D-Portal Area) <br />No. 12R6803-3F issued on December 29, 2003 (Refuse Haul Road) <br />No. 12RB802-5 issued on December 29, 2003 (Overland Conveyor) <br />No. 12RB802-6 issued on December 29, 2003 (Rail Loadout) <br />No. 85RB327F issued on April 15, 1998 (RP-2/3) <br />No. 89R6317F issued on April 15, 1998 (RP-4) <br />No. 93RB1171 F issued April 15, 1998 (RP-5A) <br />No. OOR60283 issued May 24, 2002 (B-Vent Shaft) <br />Permit Revision #05 (05/2005) I-9 <br />