My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-14_INSPECTION - M1980052
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980052
>
2008-10-14_INSPECTION - M1980052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:05 PM
Creation date
10/15/2008 2:05:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980052
IBM Index Class Name
INSPECTION
Doc Date
10/14/2008
Doc Name
Inspection report
From
DRMS
To
Keith Holsinger
Inspection Date
9/25/2008
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 38 <br />Construction Materials Rule 1 <br />1.13.1 General Provisions <br />(1) A permit granted pursuant to these Rules shall continue in effect as <br />long as: <br />(a) an Operator continues to engage in the extraction of <br />construction material and/or the mining operation and <br />complies with the provisions of the Act; and <br />(b) construction material reserves are shown by the Operator <br />to remain in the mining operation. <br />(2) The Board will consider all relevant testimony and facts related to a <br />mining operation in its determination as to whether or not <br />temporary cessation has occurred. The Board recognizes that no <br />one factor is necessarily determinative, but that each <br />determination will be based on site-specific conditions. Factors to <br />be included in the determination if a mine will be considered for <br />temporary cessation, include, but are not limited to the following: <br />1.13.2 Indications of Temporary Cessation <br />(1) there are no personnel working at the site for one hundred eighty <br />(180) consecutive days; <br />(2) there are only security personnel at the site; <br />(3) there are personnel other than security people at the site, but they <br />are engaged in activities which can be described as maintenance or <br />housekeeping, or related activity; <br />(4) there are personnel at the site, but they are engaged in activities <br />which are not significantly moving the site towards completion of the <br />mining operation. The Board will judge these activities in relation to <br />the size of the operation, the nature of the deposit and other facts; <br />(5) there is no sale or processing of material or movement of stockpiled <br />material;
The URL can be used to link to this page
Your browser does not support the video tag.