Laserfiche WebLink
:::...:............. ........................ ....... <br /> <br />HOURLY PRODUCTION ................... .. ................. . . <br />. .................. <br />sheet 2 of 2 <br />Haulina Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 18.00 LCY <br />Material description : Heaped volume : 23.00 LCY <br />Top Soil Average volume : 20.50 LCY <br />Rated payload : 55,000 pounds Adjusted capacity : 20.50 LCY `** <br />Payload capacity : 34.38 LCY *'* hourly production reflects volume per scraper pair on push-pull models <br /> <br />Cycle Time : Job Condition Corrections : Site altitude ft) : 8,000 <br /> Scraper Push dozer Source <br />Scraper loading time 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.70 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 300 0.00 2.00 2.00 2613 0.37 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.37 minutes <br />Return route : <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.28 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.26 minutes <br />Unadjusted unit production/hour : 544.80 LCY/hour *** Adjusted for job conditions : 452.19 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 452.19 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 452.19 LCY/hour <br /> <br />_.....,....:, ......,,.. ,. .......:... <br />.::. <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 17.69 Hours <br />Unit cost : $0.450 /LCY Total job cost : $3,597