Laserfiche WebLink
CIRCES Cost Estimating Software <br />PMENT MOBILIZATION J DEMOBILIZA <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining, And Safety <br />Task #: 006 State :Colorado Permitrjob #:M-1991-133 <br />Date : 12/26/2006 County :Conejos Abbreviation :none <br />User: KAP Site :Valdez Gravel Pit Filename :M133-006 <br />Permit or other job action :Bond Calculation Related To Inspection <br />Task description: MobilizelDemobilize <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Co st data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operatingcostihour: $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit CosUhour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weightlunit I <br />(Tons) Ownership <br />Cost/hrlunit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/Fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 06R Series It - 8SU (20 52.55 $51.18 $125.45 1 $176.63 $125.45 $0.00 <br />-Reveg equipment 8.00 $10.00 $88.67 1 $98.67 $86.67 $0.00 <br />sheet 1 of 2 <br />Subtotals :1 $275.30 I $214.12 $0.00 <br />:fir.,