Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD-AND. CARRY WORK <br />- <br />PROJECT IDENTIFICATION <br />005 State : Colorado Permitrtob if : M-1995-056 <br />k # <br />T <br />: <br />as <br />Date: 05/16/2007 County:Archuleta Abbreviation:none <br />User : KAP Site : Weber Pit No 2 Filename :M056-005 _ <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :Amendment <br />Task description :Install Rip Rap In Drainage Ditches W...T m <br /> <br />ENT COST Horsepower: <br />Basic machine : CA7 950G (2002) <br />HOURLY EQUIPM <br />180 <br />_ <br />Shift basis : <br />Attachment no. 1 :ROPS Cab 1 perday <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership costihour : $21.50 NA <br />Operating costlhour : $29.21 1? <br />Operator costfhour: $32.78 NA <br />l unit cosVhour : $83.49 Total fleet cQstftwur : <br />T <br />t $83.49 <br />o <br />a <br />r: <br />MATERIAL UANTITIE <br />Final <br />Initial Swell <br />224 LCY factor: NA volume: 224 LCY <br />volume: <br />Source of quantity take-oft :Reclamation Plan <br />Source of estimated swell factor : NA :::•.. <br />(Cat HB) <br />HOURLY PRODUCTION <br />Unadjusted basic cycle time (load, dump, maneuver) : 0-550 minutes <br />I oader C•`rcle Time <br /> Factor (min.) Source <br />:tie Time Factors 030 <br />0 (Cat HB) <br />Material : Material 6" and over diameter 1 <br />020 (Cat HB) <br />Stockpile : umped by truck 0. <br />000 <br />0 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable . <br /> -0.040 (Cat ..B) <br />Operation : Constant operation 0.000 (Cat HB) <br />Dump target - ominaf target <br />Net cycle time adjustment : 0010 -minutes <br /> Adjusted basic cycle time : 0.560 minutes <br />Rolling i nce - Ro ' n <br />Haul :Solt, rutted dirt, no maintenance or water, 4" fire penetration <br />Return : Soft, rutted dirt, no maintenance or water, 4- tire penetration <br />Length <br />l and Return i <br />Ha Grade res. Rolling res- Total res. Travel time I Data <br />I <br />u <br />(feet} (°!a) (.1.) (°kl (minutes) t Source <br />Haul route : 300 <br />7 10.00 8.00 18.00 0.6782 {Cat HB) <br />route . 300 <br />Retum 10.00 B.OQ <br />2,00 <br />0.2543 <br />(Cat HB) <br /> Total travel time : 0.325 -minutes <br /> Total cycle time : 1.493 minutes <br />Loader Bucket CaoaaSv -- <br />Rated capacity : 3.75 LCY (heaped) (Cat HS) <br />Bucket fill tartar : 0.825 Blasted rock - avg. Wasted (75 - 90%) <br />Adjusted capacity : 3.09 LCY <br />?¢ - rce <br />Cc diton Correction Factors Altitude adjustment factor <br />efficiency factor <br />Site altitude: 7,560 feet Job Net correction <br />Sou <br />1.00 (Cat HB) <br />0.83 (1 shililday) <br />0.83 multiplier <br />Unadjusted hourly unit production : 124.37 LCY1Hr <br />Adjusted hourly unit production : 103.23 LCY1Hr (Cat HS) <br />Adjusted hourly fleet production : 103.23 LCY1Hr <br />JOB TIME AND COST <br />1 <br />Loader(s) Total job time : 2.17 Hours <br />- <br />: <br />Fleet size <br />Unit cost : $0.809 ?- <br />/LCY Total job cost : $181 <br />.........: