Laserfiche WebLink
ROADABLE EQUIPMENT sheet of 2 <br />Machine Total Fleet Size I Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />Truck, 4x2, 30K GVW <br />-Flatbed $46.34 i $46.34 $46.34 <br />_ <br />-Light Duty Pickup, 44, 314 T. $30.69 1 $30.69 $30.69 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals :1 $77.04 • $77.04 <br />EQUIPMENT HAUL. DISTANCE and TIME <br /> Nearest major city or town within project area region : Pagosa Springs <br />Transportation Cycle Time : Non- Total one-way travel distance : 10 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.10 0.10 Total non-roadable mob/demob cost; : $1,175.53 <br />Return time (hours) = 0.10 0.10 • two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" : $15.41 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.20 0.20 <br />JOB TIME AND COST Total job time : 2.40 hours <br />Total job cost : $1,192 <br />Y is