Laserfiche WebLink
w <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year ZC08 <br />WF-C?T_ T-o(ZK -er-r M- Zo ols- o(o9 I?NCKNA bsL cFGAsCu sic. <br />mine name permit # Permittee <br />Address: Z717 CQ Z 1!5., GwrTE. _100 0 {' AP-AC.tILMS.0 CO $1 fo3s <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed Q + Li, o = ?l , O <br />Acres backfilled and graded + D <br />Acres to soiled 0 J + Q = Q <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />'include, if necessary, a description of any augmented seeding or cultural practices <br /> Last Years This Greater, <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less years t <br /> -rop s %J pile ce soi I K le <br />Acres seeded" 0,771 + 0.71 - = O • 1 + <br />For the Entire Life of Mine, the total number of acres disturbed _4 ar>ci.lkie.ic?bat.tucmber,of.acres>. <br />Phase I released D Phase II released Phase III released <br />For Mines in Permanent Cessation, <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 <br />'{exclude acres where Phase III release has been achieved) <br />Z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments: diversion and <br />collector ditches, water and air monitoring sites, tupsuil stuc:kpiles, uverburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backfiiled and graded