Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 9/13/08 <br />Weather Conditions: Clear, 95 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW-1 11:57 AM 1.00 8.6 2500 14.8 <br />SW-2 11:25 AM Dry - - - <br />SW-3 11:14 AM Dry <br />- <br />- <br />- <br />SW-4 10:40 AM Dry <br />- <br />- <br />- <br />SW-5 12:40 PM Dry <br />- <br />- <br />- <br />SW-6 11:12-AM - Dry <br />- <br />- -- - <br />- - <br />--- <br />SW-7 11:12 AM Dry <br />- <br />- <br />- <br />SW-8 10:54 AM 1.00 8.6 2300 12.0 <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet pH EC <br />umhos/cm Temp (C) <br />GW-1 11:44 AM 12.0 7.4 8200 16.5 <br />GW-3 11:23 AM 36.6 7.4 4300 16.1 <br />GW-6 11:15 AM Dry-18.8' <br />GW-9 12:38 PM 26.5 7.4 9800 16.1 <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Third Quarter 2008 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> Feet <br /> <br />3 ®e?O ® <br />0 REGI"?? <br />0 <br />°°°4 <br />J"T <br />GW-1 Total Depth 14. ° <br />o <br />0 ?S E <br />GW-3 Total Depth 47.3 '0 <br />e; <br />?' <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged o ? <br />g <br /> during gob pile construction. <br />® <br />19230 <br />GW-9 Total Depth 53.5 e-e m m <br />. UB <br /> ti <br />%k'P <br />'50 OQ pg <br />c?o <br />a®© <br />®? <br />?? <br /> eoooc <br />? <br />f <br />-OVONAI k 0* <br /> ®,aV