My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-09_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2008-10-09_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:00 PM
Creation date
10/10/2008 8:34:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
10/9/2008
Doc Name
September 2008 monthly report
From
Battle Mountain Resources, Inc.
To
DRMS
Email Name
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,-- <br />~, <br />/~ <br />~~^> f _ _- <br />~~ F~ <br />~,~:~' Jf BATTLE MOUNTAIN RESOURCES, INC. ~ <br />October 07, 2008 <br />G''~~ <br />\1; <br />Mr. Allen Sorensen <br />State of Colorado ~~~' ~ <br />Division of Minerals and Geology ~,,~,~ , ~~ 1 <br />~: _; . <br />1313 Sherman Street, Room 215 lf`.:,~ - <br />Denver, CO 80203 ~ ~. .: <br />Re: Battle Mountain Resources Inc. <br />San. Luis Project / <br />CMLRB Permit No. M-88-112 <br />/September 2008 Monthly Report <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of September 2008. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on September 29~', no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on September 28~'. September tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />collected for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QA/QC plan. <br />T'he leak detection system was measured on September 30`x. A total of 610 gallons of water was <br />excavated from the leak detection system yielding a monthly average of 20.33 gpad. The tailings <br />pond under-drain measured 35 gpm. <br />During September the West Pit water treatment plant operated efficiently discharging a total of <br />8,237,200 gallons (25.28 acre-feet) of water to Rito Seco Creek and a total of 538,800 gallons <br />(1.65 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br /> <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.