Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />................................................... <br />............:::......:.............................................................................. <br />PROJECT IDENTIFICATION <br />Task #: 242 State : Colorado Permit/job# : C-1981-038 <br />Date : 1010612008 <br />User : JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 50 <br />Task description : Regrade Drill Pads <br />.;;:.; :.::.................;;:..:::::............::....................................... .............. . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br />...........:::::::::::::................................. <br />MATERIAL QUANTITIES .........::............................................ ................................................................. .............. <br />Initial Swell Loose <br />volume : 1,100 BCY factor : 1.250 volume : 1,375 LCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted till or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.32 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 338.92 LCY/hr <br /> Adjusted fleet production : 338.92 LCY/hr <br /> <br />:.......... <br />JOB TIME AND COST ....................... ................................................................. .............. . <br />Fleet size : 1 Dozer(s) Total job time : 4.06 Hours <br />Unit cost : $0.612 /LCY Total job cost : $842 <br /> <br />County :Delta <br />Site: Bowie No. 1 Mine <br />Abbreviation :none <br />Filename : C038-242