Laserfiche WebLink
^ y MC ENGINEERING <br />October 3, 2008 <br />61 1 Skyline Road - Laramie, WY 82070 - (307) 742-0031 <br />FAX (307) 721-2913 - E-mail: intolar@wwcengineering.com <br />Mr. Jason Musick <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203-2273 <br />RE: Edna Mine Third Quarter 2008 Impoundment Inspection Report <br />Dear Mr. Musick: <br />This letter constitutes the Third Quarter 2008 Impoundment Inspection Report for the Edna <br />Mine (C-80-001). The Impoundment Location Map (Attachment A) details the location of <br />each impoundment inspected. Quarterly Pond Inspection Reports (Attachment B) <br />document water level, sediment level, outflow, and required maintenance cited per <br />inspection. <br />The inspections were performed September 22, 2008 by field inspector Troy Summers. <br />The Third Quarter 2008 Impoundment Inspection Reports have been certified by Colorado <br />Registered Professional Engineer Doyl Fritz. All structures were functioning as designed at <br />inspection. Minor maintenance not associated with impoundments will be performed on <br />the North Road Entrance Gate during the 2008 maintenance season (Attachment C). <br />Should you have any questions regarding this material, please contact me at your <br />convenience. <br />Sincerely <br />04_? <br />Beth Heesen, P.G. <br />Project Manager <br />TNS <br />Attachments (A, B & C) <br />File: 99-144 <br />cc: Steve Leach <br />Edna Mine Permit