Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Refuse Pile <br />Location: Foidel Creek Mine <br />Client: Twentymile Coal Co. <br />Project No.: 99-3983 <br />Report No.: 41 <br />Date: 07/03108 <br />Time: 4.0 <br />Mileage: 44 <br />Engr./Tech: CR <br />Work Performed: <br />As requested, we visited the project site on today's date and conducted compaction test No.'s 380 through 383 on <br />the material that was placed in the Refuse Pile. <br />Twentymile Coal Company crews placed and compacted processed Waste Coal in Areas 2 '/z and 3 at the Refuse <br />Pile. <br />We also obtained samples for moisture content determination and a composite sample was obtained for <br />checkpoint Proctor determination. The sample matched a previous curve on the job, Proctor Sample Number 7P. <br />Remarks: <br />The material tested generally met the project specifications for compaction. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Travis Johnson of Twentymile Coal Co. was notified of today's test results.