Laserfiche WebLink
Permit or other job action :Bond Recalculation Related To Inspection <br />Task description : Mobilize/Demobilize <br /> <br />..:::. . <br />EQUIPMENT TRANSPORT RIG COST Shift basis : <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (2 47.17 $50.32 $117.55 1 $167.87 $117.55 $0.00 <br />-CAT 120H 12.52 $17.69 $88.67 1 $106.36 $88.67 $0.00 <br />Subtotals :1 $274.23 1 $206.22 1 $0.00