Laserfiche WebLink
EXHIBIT L <br />LUSK PIT #36 <br />RECLAMATION COSTS <br />Estimated costs to reclaim the mining site: <br />EQUIPMENT $/HOUR HOURS TOTAL <br />Backfilling: <br />1 Loader 60.00 12 $720.00 <br />1 Dozer 60.00 12 $720.00 <br />3 Trucks 35.00 12 $1,260.00 <br />5 Men 12.67 12 $760.20 <br />Topsoil Application: <br />1 Loader 60.00 10 $600.00 <br />1 Man 12.67 10 $126.70 <br />Seeding: <br />1 Tractor/Grass Drill 25.00 4 $100.00 <br />1 Man 12.67 4 $50.68 <br />Mulching: <br />2 Trucks 35.00 10 $700.00 <br />1 Loader 60.00 10 $600.00 <br />3 Men 12.67 10 $380.10 <br />Moving Equip. from <br />Pritchett: <br />1 Semi/Lowboy Trailer 35.00 2.5 $87.50 <br />1 Loader to site 60.00 0.25 $15.00 <br />1 Dozer to site 60.00 O A25 $15.00 <br />1 Loader to topsoil site 60.00 1.5 $90.00 <br />1 Man 12.67 2.5 $31.68 <br />Grass Seed: $250.00 <br />Total: $6,506.86 <br />+15.8%: $1,028.08 <br />Grand Total: $7,534.94 <br />No temporary seeding will be d one.Topsoil will be stoc kpiled for reclaiming purposes. Slopes will be 3:1 <br />to native grasses. <br />