Laserfiche WebLink
TABLE 2.05-E5-T1 <br />SOIL RECOVERY AND REPLACEMENT SUMMARY' <br />Mine Disturbance Area Disturbance Area Ac Soil Recove Volume Re lacement th Ff Re lacement Volume C <br />Elk Creek Coal Handling, Support, and <br />Ancillary Facilities' 39.0 5,600 0.3 17,600 <br />Rock Dust 0.5 <br />Temp Conveyor 0.3 <br /> <br />Sanborn Creek Mine Surface Facilities 4.1 2,600 0.5 3,300 <br />Borrow Area 0.43 N/A N/A N/A <br /> <br />West Valle Fill and Haul Road 12.9 10,400 0.70 15,800 <br /> <br />Elk Creek Mine Surface Facilities 24.2 46,600 0.7 27,300 <br />11 West 3.33 5,370 0.7 5,370 <br /> <br />Satellite Facilities <br />Upper Hubbard Creek Facilities <br />3.3 <br />850 <br />0.2 <br />850 <br />Lower Hubbard Creek Facilities <br />Hubbard Creek Powerline Road 2.6 <br />0.7 N/A <br />N/A N/A <br />N/A N/A <br />N/A <br />Bear Creek Facilities Area 3.0 N/A N/A N/A <br />Water Treatment Plant Area 1.5 N/A 0.5 1,200 <br />Sewage Effluent Absorption Field 0.3 N/A N/A N/A <br />Substation No. 3 and C-Gulch Ventilation <br />Installation 1.6 5,000 1.9 5,000 <br />Coal Gulch Exploration Sites 0.4 N/A N/A N/A <br />Powerline Roads 17.0 N/A N/A N/A <br />De assification Borehole Sites and Roads 39.92 N/A N/A N/A <br />Hubbard Creek Fansite 3.2 4330 1.0 4330 <br />Bear Creek D-Seam Fansite 2.3 1,000 1.0 1,000 <br />Subtotal - Satellite Facilities 75.82 11,180 N/A 12,380 <br /> <br />Total 119.2 81,750 81,750 <br />Notes: All soil would come from North Elk Creek Soil Stockpile except for satellite facilities, which each have their own soil stockpile (only satellite facility with a remaining soil <br />stockpile is Substation No. 3 and C-Gulch Ventilation Installation) <br />' No soil was recovered for the majority of this area (pre-law disturbance). Soil volumes shown were recovered during recent mine facilities expansion. <br />2 Facilities have been reclaimed, with available stockpiled topsoil or suitable surficial materials used in reclamation. <br />3 Powerline roads have been disturbed by Delta-Montrose Electric Association and are not mine disturbance. <br />`As short-term disturbances, all soil recovered from borehole sites and roads has been windrowed adjacent to disturbance and directly replaced on completion of disturbance <br />(volumes not measured). <br />5 Since no soil was recovered from original disturbance areas, use of suitable surficial materials as revegetation medium has been approved and will be supplemented with <br />available excess soil from other areas, with priority on areas where surficial materials are marginal to unsuitable. <br />6 Soil replacement depth for West Valley Fill will be 1 foot with 0.7 foot replacement depth for the remainder of disturbance area. <br />7 Although soil was not originally salvaged from this area, available excess soil from other areas will be used to enhance revegetation success. <br />e Soil recovered and used as replacement from this area will be the top 1.0 foot of material used in reclamation of previous disturbance. <br />TR-60 Revised September 2008