My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-29_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2008-09-29_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 2:57:06 PM
Creation date
10/6/2008 1:42:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/29/2008
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II - REVISIONS TO THE PERMIT <br />The following is a summary of revisions to the permit since the RN-4 proposed decision dated July 3, 2006. <br />Since the RN-4 decision was issued, there has been an increase in bond amount required from <br />$9,517,212.00 to the current liability amount of $11,117,348.00. As stated in Section VI, the current bond <br />amount held exactly matches the required liability amount calculated by the Division ($11,117,348.00). <br />TECHNICAL REVISIONS <br />No. Subiect Decision and Date Bond Adiustment <br />55 2006 Neck Pit Slide Repair Approve 3/1/07 No <br />56 016 Watershed Revised Sediment <br /> Modeling Approve 1/11/07 No <br />57 Revised Wildlife Monitoring Plan Approve 7/9/07 No <br />58 Hydrology Monitoring Reduction Approve 7/5/07 No <br />59 Revised Permanent Channel <br /> Designs and Runoff/Sediment <br /> Modeling (005 Watershed) Approve 10/30/07 No <br />60 PM-4C Design Revision; NOV <br /> Abatement Approve 8/2/07 No <br />61 Revised Backfill and Grading <br /> Schedule (application deemed complete <br /> 8/18/08) Pending N/A <br /> MINOR REVISIONS <br />No. Subiect Decision and Date Bond Adjustment <br />60 Ownership & Control Update Approve 3/15/06 No <br />61 Landowner Road Retention Requests Withdraw 8/6/07 No <br />62 Updated CDPS Discharge Permit Approve 12/19/06 No <br />63 Shrub Plot Slide Remediation Approve 8/2/07 No <br />64 Name Change to LLC Approve 8/6/08 No <br />SECTION III - STATUS OF STIPULATIONS <br />Stipulation 32 is the only stipulation that was attached to the most recent permit renewal approval decision <br />(RN-4, 7/3/06), and there have been no additional stipulations attached to the permit subsequent to RN-4 <br />approval. The stipulation originated with the TR-42 proposed decision, issued 10/14/03. The stipulation <br />required submittal of a complete revision application containing applicable demonstration of compliance for <br />permanent road retention including signed landowner requests for roads or road segments to be retained for <br />the postmining land use. The demonstration is to be submitted to and approved by the Division prior to <br />approval of Phase 1 Bond Release for any reclamation parcel that includes a permanent road or road <br />segment. The stipulation remains active. Please refer to the July 3, 2006 RN-4 Findings of Compliance, <br />Proposed Decision Section, for a detailed discussion of stipulation status and history for the operation. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.