Laserfiche WebLink
SL-10 Table of Contents <br /> Section Subject Page(s) <br /> <br /> Phase III Bond Release--Introduction 1 <br /> 1.0 Bond Release Parcels Management and Reclamation Histories 1 <br /> 2.0 Documentation of Successful Vegetation Establishment 1 <br /> 2.1 Vegetation Sampling Summary 2 <br /> 2.2 Sample Adequacy 2 <br /> 3.0 Achievement of the Post-Mining Land Use 2 <br /> 3.1 Rangelands 2 <br /> 4.0 Potential Hydrologic Impact 6 <br /> 4.1 Permanent Hydrologic Features 6 <br /> 4.2 Surface Water Impacts 7 <br />. 4.3 Ground Water Impacts 7 <br /> 4.3.1 Impacts to Adjudicated Wells .9 <br /> 4.4 Post Mine Hydrologic Balance 9 <br /> 4.5 Sediment Loss Evaluation 10 <br /> 5.0 Proposed Reduction in Bond Obligation 10 <br /> TABLES <br /> Table 2.1-1 Vegetation sampling summary and comparison against 3 <br /> bond release standards. <br /> Table 2.2-1 Reverse null T-Test on mean to demonstrate revegetation 5 <br /> success for production and shrub density values. <br /> Table 4.1-1 Trapper Mine livestock water tanks history of water availability 8 <br /> Table 5-1 Calculation of bond liability to be released with SL-7 phase 111 11 <br /> request. <br />0