Laserfiche WebLink
f <br />C-1996-083 Bowie No. 2 TR-55 <br />2nd Adequacy Review - MLT <br />17-Sep-2008 <br />Page 3 of 3 <br />8.) The cover letter indicates that the soil slope will be reinforced with riprap, but the <br />typical section does not identify the reinforcing material to be used. <br />Please provide the estimated size of riprap to be used to reinforce the I H: IV <br />slope above the portals, and label the Existing Grade (red line) as such. <br />(Items Resolved) <br />Typical Section D <br />9.) In the diagrams for Wall #1 and Wall 42, the colors used are inconsistent with the <br />wall colors used elsewhere in the maps. <br />Please refer to comment 5), above. <br />(Item Resolved) <br />10.) In the Slope diagram, the line colors are reversed from those used in the other <br />Typical Sections. <br />Please change the Existing Grade line color to red, to be consistent with the <br />scheme used elsewhere on the Map. <br />(Item Resolved) <br />11.) No permit application text was provided to describe the proposed operations. <br />Please provide revised permit application text that describes the operations <br />proposed in TR-55. <br />(Item Resolved) <br />Please do not hesitate to contact me with any additional questions that may arise. <br />cc: Sandy Brown, DRMS