Laserfiche WebLink
0 1 .3 Topsoil Replacement Documentation <br />Trapper is confident that average topsoil replacement depths meet at least minimum requirements for all <br />parcels included in this Phase II bond release application. Trapper's topsoil replacement monitoring <br />practices have been very uniform throughout the life of mine and are conducted in such a way as to <br />insure adequate topsoil replacement depths. Trapper has always closely monitored topsoil replacement <br />depths by means of concurrent, systematic field depth sampling by trained individuals. This field <br />monitoring always occurs within one to several days of topsoil replacement. by scraper crews and is <br />conducted before the crews leave the area. In areas where topsoil is found to be replaced at less than <br />the approved depth, scrapers are sent back into the area to lay down at least the required topsoil depth. <br />Table 1.3-1 summarizes Trapper Mine topsoil replacement depth data and provides information on data <br />origin. Topsoil replacement depth information is also summarized in Appendix 2.1 parcel history sheets. <br />• <br />• <br />9