Laserfiche WebLink
6.4 SPECIFIC EXHIBIT REQUIREMENTS - REGULAR 112 OPERATIONS <br />Reclamation Permit Application Form <br />On the first page of the Reclamation Application Form in section 3, the first blank for <br />permitted acres should be zero as there is no existing permit. The second blank (3.1) for <br />this section should read +80.9 acres as this is the total amount of permitted acres you <br />would like to add with your application. The third blank (3.2) should be the total <br />permitted acres which will still be 80.9 acres. Please revise this section accordingly. <br />Please change the primary future post-mining land use (section 12, page 4) from <br />pastureland to rangeland to match the figures and text in the rest of the application. <br />Please re-submit these two pages with these changes for the updated site file. <br />6.4.1 EXHIBIT A - Legal Description <br />This section is adequate as submitted. <br />6.4.2 EXHIBIT B - Index Map <br />This section is adequate as submitted. <br />6.4.3 EXHIBIT C - Pre-mining and Mining Plan Map(s) of Affected Lands <br />This exhibit will require just a few modifications before it can be approved. First, the <br />topsoil and overburden piles will need to stay within the affected area of the permit <br />boundary (inside the 200' buffer area you have marked, not between the buffer line and <br />the property line). Secondly, you will need to show the route for the access road that you <br />will be using to get to and from the pit. Lastly, you will need to clearly show the extent <br />of the prior pit disturbance, how much of that area will be within your proposed new <br />operation, and how it relates to the 200' buffer area. You will be responsible for the <br />reclamation of any of the areas of the former operation you re-disturb, so if you want to <br />leave out areas of the former pit, you will need to show this clearly on this map.