Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and h <br />vegetat ow topsoil will be salvaged, stockpiled and redistributed for the re-establishmsertt of <br />n4 Specify approximate topsoil redistribution depth: <br />4- Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />S. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule S for <br />specific reclamation Pao nc stands ) Y may wish to contact the Division for closure specifications. <br />6. Describe hcfw roads will be reclaimed or returned t() their pre-MSpecting (or better) Condition-