Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Support equipment -Load area <br />-Dump area <br />Koaa maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : upport Equipment <br />d Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : W A <br />f NA NA NA <br />% Utilization-machine A NA NA NA <br />-Ripper att achment A NA NA NA <br />Ownership cost/hour : $14.80 . $29.49 NA NA NA NA <br />Operating cost/hour : $41.71 $40.39 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $21.72 $32.78 NA NA NA NA <br />Unit subtotals : $78.22 $102.66 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $415.55 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $415.55 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,800 LCY factor : NA volume : 7,800 LCY <br />Descr. : <br />Material weight: 2,800 pounds/LCY Struck volume : 12.00 LCY <br />- Natural bed Heaped volume : 1800 LCY <br />Rated payload <br />Payload capacity <br />50,300 pounds Average volume : 15.00 LCY <br />17.96 LCY Adjusted volume': 17.96 LCY <br />Final truck volume based on number of loader passes : 16.62 LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loadinq Tool Capacity : Job Condition Correctiot <br />Rated capacity (nom. heaped) : 4.750 LCY Truck <br />Descr.: Loose material - 1"and over (85 - 905'.) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 4.156 <br />LCY Job efficiency : <br />Net correction : 0.830 <br />0.830 <br />Truck/loader team -Truck : Generic 12-18 cy, 6x4 <br />-Loader : CAT 966G (2002) <br />sheet 1 of 2 <br />Site altitude (ft.) : 6,570 <br />Loader Source <br />0.920 (Cat HE <br />0.830 0 shift/da <br />0.764 J