Laserfiche WebLink
RnAnARI F FOUIPMFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $76.75 1 $76.75 $76.75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $76.75 $76.75 <br />.......................... <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost' : $0.00 <br />Return time (hours) = 0.38 0.38 * two round trips with haul rig <br />Loading time (hours) = NA Total roadable mob/demob cost "* : $57.56 <br />Unloading time (hours) = NA ** one round trip, no haul rig <br />Subtotals = 0.75 0.75 <br /> <br /> <br />JOB TIME AND COST <br />Total job time : -:.... <br />0.75 hours <br /> Total job cost : $58