My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-24_REVISION - M2002111 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002111
>
2008-09-24_REVISION - M2002111 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:59 PM
Creation date
9/30/2008 11:24:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
REVISION
Doc Date
9/24/2008
Doc Name
Bond calculation & approval of TR-02
From
DRMS
To
Brownfield Restoration Group, LLC
Type & Sequence
TR2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK L IST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />01a -Demo and removal of 12 foot wide gate at east entrance demolish 1 5.0 $299 <br />02a -Mobilization to and from site mobilize 1 0.7 $58 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 5.7 $357 <br />* includes inflation factor adjustment of <br />NA % <br />TOTAL DIRECT COST * <br />$357 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />6- <br />NA <br />$36 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $47 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $404 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $20 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST $67 <br />TOTAL BOND AMOUNT (direct + indirect) _ $424
The URL can be used to link to this page
Your browser does not support the video tag.