Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />D? <br />i` <br />4. Describe how drill holes will be. plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />ne c au,S i, i i ?t1 Lco r?1 H ?T? c1 ` M`a??: s >.'t1 S_. lea t!?e? ?? n p ?v??? 5. . <br />` 3 gee <br />o -t- c-ce c4. deeA- 4 c? YC Ma? e c . ??_ <br />off, ?.? .?1; ?.?. ? ?b??•? ? ?1? <br />U'j <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />NA l :" <br />6. Describe how roads will be reclaimed or returned to t'he'ir pre-prospc\cting (or better) condition: <br />?N GS '?-2? n, ? (1nC ?. ,cv? < nom 1- r ^ e-A i-j M I-0 ra i <br />i.re, r