Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY I/ <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 22, 2008 V <br />Mr. Roger Day <br />American Shale Oil, LLC <br />P.O. Box 1470 <br />110 E. P Street, Suite 210 <br />Rifle, CO 81650 <br /> <br />Mining and 5a zt1 aciarnation <br />n o t D'a <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Re: American Shale Oil, LLC. RD &D Project, Notice of Intent (NOI) P-2008-046,(nd Notice of <br />Deficiency.) Dear Mr. Day, <br /> <br />The Division of Reclamation, Mining and Safety (DRMS) has reviewed the response to the August 4, <br />2008 Notice of Deficiency for the Notice of Intent to Conduct Prospecting Operations (NOI), No. P- <br />2008-046, submitted by Western Water and Land, Inc. August 18, 2008. The application cannot be <br />approved until the following issues are adequately addressed. Please submit a response to the following <br />issues as soon as possible but no later than September 26, 2008, so the decision date of October 3, 2008 <br />can be met. If your response, or a written request for an extension of the decision date, is not received by <br />September 26, 2008 then the request for the modification may be denied. <br />1) In Section 2.0 SURFACE WATER, on page 2, there is a typographical error or omission; "The <br />sites will be marked in the field, and the Global Positioning System (GPS) location of each site <br />will be recorded. " Please correct the sentence to state what the sites will be marked with. <br />2) If micro purging sampling is to be performed on wells without the use of dedicated pumps, what <br />will be the time interval between pump installation and sampling? <br />3) For the micro purge method, at what depth below the static water level will the sampling pump <br />be engaged? <br />4) For micro-purging, what changes in water quality parameters are expected during the 5-10 <br />minute monitoring intervals and how will they affect the method and timing of sample <br />collection? <br />5) If dedicated equipment is used in micro-purging, the pump and tubing must be initially purged to <br />remove any stagnant water in the apparatus. Please indicate what purge methods will be used <br />prior to sample collection. <br />Office of <br />Office of Active and Inactive Mines <br />Mined Land Reclamation Denver Grand Junction Durango