Laserfiche WebLink
~.. <br />~( ~ Huddleston-Berry <br />.1~.1j~ Eagmrering & 1'ntiag, LLC <br />~`: <br />REVIEW <br />Project No.: 00256 - 0576 Observed By: BD Date: 3/28/08 <br />Project Name: Tri County Dike Authorized By: Client Date: 3/28/08 <br />Client Name: United Companies Reviewed By: JAL Date: 3/31/08 <br />Installation Contractor: United Companies Contractor Representative: Mike <br />Physical Address: _ <br />Installation Equipment: <br />Datum: <br />Arrived on site to perform a soils compaction on dike about 70' east to west and mike with united was 1' from finish subgrade.And had <br />placed 4' to 5' of pit run and 4' of soils from the east stock pile I had them pothole 6 areas so I could test every foot <br />tried to get a hold of brent with united to ask about the 4' to 5' of pit run that were placed on the bottom of the dike <br />Could not get a hold of him left message on his cell phone <br />General Remarks: <br />Record No. 1 RW <br /> <br />