Laserfiche WebLink
n <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Permittee Name: ANDESITE ROCK COMPANY <br />Permit No.: M-1988-048 <br />Operations Name: CARR GRAVEL RESOURCE <br />Anniversary Date: September 22, 2008 <br />Total: $791.00 <br />1. a. Permitted acreage: 1412+/- b. County where mine is located <br />2. Has this mine been granted Temporary Cessation Status? <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year: * <br />a. Total acres affected to date <br />5. Total acres reclaimed for the report year: * <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used for the report year: * <br />10. Estimated total acres to be affected in the next report year: * <br />11. Comments: <br />WELD <br />W=&& NO <br />MORE L <br />M NQ <br />approx. 40 <br />approx. 840 <br />approx. 65 <br />approx. 30 <br />approx. 6" <br />approx. 30 <br />as per permit <br />not/applicable <br />not/applicable <br />not/applicable <br />approx. 50 <br />Minina continued this report vear in an area located south of the processing plant (Phase 4). We <br />currently have active mining operations in the southeast section of this area, and will continue in this <br />area for at least another year. We topsoiled and seeded the area of Phase 4 that we mined the <br />previous year. This fall we plan to topsoil and seed in the area that we mined this report year. All <br />seeding is per the seed mix in the permit Mining in the upcoming year will continue in Phase 4 <br />continuing in a southerly direction. See the attached map for areas. <br />* Please show the location of the acreage for items 4-6 on your map**. Indicate the phases of the reclamation which have been <br />completed, correlated with your timetable. For phased operations, show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you previously submitted a map which correctly <br />depicts the current acreage in items 2 through 6, then a ap is unnecessary. However, this must be stated. <br />Signature: Date: <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Lynn Mayer Shults Phone: 303-287-2247 <br />Company: L. G. Everist Inc.. dba Andesite Rock Company Fax : 303-289-1348 <br />Address: 7321 East 881h Avenue. Suite 200. Henderson. CO 80640 Email: Imshultse-lgeverist.com <br />Federal Tax ID: Andesite Rock Company 84- <br /> DRMSAn nRpt2008-091808.doc