Laserfiche WebLink
Table-4 <br />Aggregate Industries-WCR, Inc. <br />WW Farms Expansion <br />Water Balance <br />Applegate <br />Group, inc. <br />Date: June-08 <br />Job #: 06-103 <br />Net Depletions South Platte Replacement Sources Balance <br /> <br />Month <br />Total <br />Depletions <br />(af) <br />(1) <br />Lagged <br />Depletions <br />(af) <br />(2) Net Accretions <br />and Depletions <br />for 2.5 sh of <br />Whitney (af) <br />(3) <br />Net <br />Obligations <br />(af) <br />(4) <br /> <br />Excess CU <br />Credit (af) <br />(5) Available <br />Perpetual Lease <br />from <br />Westminster <br />(6) <br />Thornton <br />Effluent <br />Lease <br />(7) <br /> <br />Centennial <br />Lease <br />(8) <br />Excess South <br />Platte CU <br />Water <br />(9) <br />Jan 0.25 0.15 -1.25 -1.40 18.36 1.47 18.43 <br />Feb 0.44 0.31 -1.11 -1.42 16.53 1.38 16.49 <br />Mar 1.15 0.77 -0.99 -1.76 18.29 1.47 18.00 <br />Apr 1.74 1.28 0.27 -1.01 17.43 16.42 <br />May 2.48 1.88 5.53 0.00 3.66 17.76 17.76 <br />Jun 3.10 2.44 8.21 0.00 5.77 16.72 16.72 <br />Jul 3.30 2.76 13.84 0.00 11.08 9.96 9.96 <br />Au 2.93 2.66 12.04 0.00 9.38 9.97 9.97 <br />Se 1.81 1.98 5.40 0.00 3.42 9.82 9.82 <br />Oct 1.37 1.51 -1.50 -3.01 17.69 17.10 31.79 <br />Nov 0.77 1.04 -1.72 -2.76 17.46 1.42 16.13 <br />Dec 0.25 0.58 -1.45 -2.03 18.28 1.47 17.72 <br />Total 19.60 17.34 37.26 -13.39 33.31 188.27 7.22 17.10 199.20 <br />Notes: <br />(1) Total Depletions from Table 2 <br />(2) Glover Technique: T = 117,000 gpd/ft, Dist to River = 700 ft, Width of Alluvium = 8750 ft; S = 0.2 (see Appendix A) <br />(3) Aaccretions are (+) gains to the stream system and depletions (-) are owed <br />(4) Includes the Return flow obligations from the Whitney + the Lagged Depletions from the Site <br />(5) Whitney CU in excess of depletions that need replacement. <br />(6) Perpetual Lease from Westminster is 295 ac-feet - 20 of used for Teti Aug Plan (includes 0.5% transit loss per mile for 63 miles) <br />(7) On-going lease of Effluent from the City of Thornton (includes 0.5% transit loss per mile for 63 miles) <br />(8) On-going lease from Centennial for 30 of (includes 0.5% transit loss per mile for 86 miles) <br />(9) Sum of (6) + (7) + (8) - (4) the Net Obligations for the Site