My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-18_INSPECTION - M1983175
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1983175
>
2008-09-18_INSPECTION - M1983175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:22 PM
Creation date
9/23/2008 8:23:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
INSPECTION
Doc Date
9/18/2008
Doc Name
Unresolved problems related to inspection
From
DRMS
To
Southwest Redi-mix, Inc.
Inspection Date
9/26/2007
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE-CF 1a- <br />DEC 1 e, 2007 <br />Division ofReclamation' <br />Mining a <br />November 29, 2007 <br />Ms. Kate Pickford <br />701 Camino Del Rio <br />Rut 315 <br />Durango, CO 81301 <br />IoLf t?? , 2,:: f,/0? <br />LJ DEVELOPME T, INC <br />256 N. MERRILL DR - <br />PUEBLO WEST, CO 81007 4EG 0 5 2007 <br />PHONE: 719-240-9424 FAX719-583-0768 _ <br />Mining snd Saiety <br />RE: Request extension to correct Items # 1 and #2, under "Problems/Possible Violations and <br />Corrective Actions" listed in the Inspection Report dated 0926/2007for MLRB permit No.4-7 <br />1983-175, Alamosa Pit # 2, Southwest Ready Mix, Inc. <br />Dear Ms. Pickford: <br />You conducted a mine site inspection of my client's operation, Southwest Ready Mix, Inc. <br />Alamosa Pit #2, Permit No. M-1983-175. The inspection was conducted September 26, 2007. <br />In that inspection, you identified several items needing corrective action. Item number one (1) of <br />the inspection report requires actions necessary to address items that may be of concern to the <br />Division of Water Resources, Office of the State Engineer. Specifically, the corrective action <br />requires the Operator, Southwest Ready Mix, Inc. to, "Either fill the pit to at least two feet above <br />the ground water surface or demonstrate that the operation is in compliance with the Office of <br />the State Engineer within sixty (60) days of receipt of this inspection report." <br />Of the two options offered, the Operator chooses, at this time, to explore securing water rights <br />sufficient to satisfy SEO possible concerns. This process will take some months to conclude. <br />Southwest Ready Mix, Inc. is therefore requesting an additional 9 months from the date of this <br />letter to perfect the necessary water rights. In addition, the Operator will provide up-dates as to <br />its progress in securing sufficient water rights at three month intervals- <br />Item number two (2) in the September 2e, 2007 inspection report concerned placement of an <br />"...impermeable berm below the firel storage tanks and either have the contents of the 55-glion <br />drums certified as non-hazardous or have the drums and their contents removed from the site and
The URL can be used to link to this page
Your browser does not support the video tag.