Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 193 State : Colorado Permit/job# : C-1981-022 <br />Date <br />User <br />09/18/2008 <br />JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 61 <br />Task description : Replace Topsoil from Stockpile to Drill Pad <br />::::;.;;:.; :.................. ................................................................................. <br />HOURLY ......................................................................................................... <br />EQUIPMENT COST <br />volume : 400 BCY <br />factor : 1.250 volume : 500 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />..:.;::. :.:.................... <br />HOURLY <br /> <br />PRODUCTION ...........:.: <br /> <br />:::...::::.:.;:.; <br />.....:....:..................:......... ................. .............. <br />Job Condition Correction Factors <br /> <br />...........: <br />..................... <br /> <br />::::......::.:::::::::.::.::::: . <br />....... <br />.......................... <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (Ind-ri) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed <br />Adjusted unit production <br />Adjusted fleet production <br />350.93 <br />350.93 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 1.42 Hours <br />Unit cost : $0.591 /LCY Total job cost : $296 <br />County :Delta <br />Site : Elk Creek Mine <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Abbreviation :none <br />Filename : C022-193