My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-22_PERMIT FILE - X200823002 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200823002
>
2008-09-22_PERMIT FILE - X200823002 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:29 PM
Creation date
9/22/2008 3:53:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200823002
IBM Index Class Name
Permit File
Doc Date
9/22/2008
Doc Name
NOI Application
From
Blue Mountain Energy
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.0 INCORPORATED STIPULATIONS FOR DRILLING ADAPTED FROM <br />EXPLORATION LICENSES COC-62949 AND COC-67737 <br />The proposed stipulations for drilling under the proposed Exploration License are listed below. <br />(a) Prior to any surface disturbing activities, the licensee shall conduct a cultural resources <br />survey of all previously unsurveyed areas in accordance with the exploration license. If <br />cultural resources are discovered during exploration operations, the licensee shall <br />immediately notify the White River Field Office Manager. <br />(b) Cheatgrass and weeds will be controlled on disturbed areas. <br />(c) NA <br />(d) NA <br />(e) All drill holes shall be plugged with cement from at least 50 feet below to 50 feet above <br />all aquifers and underground minable coal beds, and a cement surface plug shall be <br />set. Item A illustrates the minimum requirements for plugging drill holes. All drill holes <br />shall be plugged as contemporaneously as possible with their drilling. <br />(f) All drill hole cementing shall be done with a recognized oil field cement pre-mixed at <br />the surface with water and any additives considered necessary for encountered drill <br />hole conditions. For all drill hole plugging operations, the licensee shall submit to the <br />White River Field Office Manager completed Sundry Notices together with copies of all <br />cement invoices in addition to any required reports. <br />(g) One copy of drill hole data and related reports must be submitted to the White River <br />Field Office Manager within 30 days after each calendar year. The requirements for <br />submission of drilling and abandonment information are given to the licensee as Item <br />B. The licensee's location map must show access trail locations and exact hole <br />locations appropriately identified by number or letter. Submitted data must be tied to <br />the hole number or letter designations. <br />13
The URL can be used to link to this page
Your browser does not support the video tag.