Laserfiche WebLink
_ ................. <br /> <br />ADJUSTED COSTS ............................................... .................._.._........._........... ...... ..._..__... <br /> <br />Ownership Costs <br /> <br />Depreciation CFC Overhead .......... ........... <br />_...__...........- <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost: $14.49 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $14.49 NA NA $5.33 $14.28 $7.97 $13.98 NA NA NA NA <br />-Attachment No. 2: NA NA NA NA NA NA NA NA NA <br />Annual usage : $22.25 $13.39 $14.84 NA NA NA NA NA NA NA NA <br />Double shifts : $16.69 $6.70 $7.42 NA NA NA NA NA NA NA NA <br />Triple shifts : $14.84 $4.46 $4.94 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $3.12 NA $4.67 NA NA NA NA NA <br />-Attachment No. 2:1 NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $37.31 $7.39 $4.55 $0.60 <br />Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />....... ............... <br /> <br />ADJUSTED COST SUBTOTALS ................................... ........ <br /> <br /> <br /> <br />epreciation ..................._.................. <br /> <br />Ownership Costs <br /> <br />CFC ................................ <br /> <br /> <br /> <br />verhead ..................._...._._.......... ... <br /> <br /> <br />Overhaul <br />Labor Parts <br />.._................-._ - - <br />........ <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $22.25 $13.39 $14.84 $3.12 $14.28 $4.67 $13.98 $37.31 $7.39 $4.55 $0.60 <br />Double shifts : $16.69 $6.70 $7.42 ttachment: <br />Triple shifts : $14.84 $4.46 $4.94 NA NA NA NA NA NA NA NA <br />HOURLY OPERATOR WAGES Base Fringe F.1.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado Labor zone : 2 <br />Scraper operator (<40cy) $17.62 $3.16 $1.35 $1.09 $1.73 $24.95 Day : $0.00 Two shift per day average : $0.15 <br />Scraper operator (40+cy) $17.62 $3.16 $1.35 $1.09 $1.73 $24.95 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.64 $24.90 Night : $0.45 <br />....................................................... ................. _..... <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating and Overhaul <br />Machine Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />Single shifts : $50.48 $85.90 NA $24.95 $161.33 <br />Double shifts : $30.80 $85.90 NA $25.10 $141.80 <br />Triple shifts : $24.24 $85.90 NA $25.20 $135.34 <br />........- . .....................:::.:.:::..:.:::::..:.::.:.:...:.:::.:.: .::.:..:......:::.::::......: <br />EQUIPMENT PERFORMANCE: DATA <br />Description Type .:::... _:::_...-.._..... :::::.. <br />Struck <br />Capacity (cy) .......... <br />Heaped <br />Capacity (cy) <br />Weight <br />(UST) <br />Weight <br />(MT) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) <br />Min. turning <br />circle (ft) <br />Horsepower <br />(fhp) <br />Fuel <br />type <br />Cat 621G Single engine conventions 14.00 21.00 35.55 32.24 42.42 11.33 12.17 38.42 365.00 Diesel <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph): 1st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forward : NA NA NA NA NA NA NA NA clearance (ft.) height (ft.) <br />Reverse: NA NA NA NA NA NA NA NA NA NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA NA NA NA NA NA NA NA