My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-19_REVISION - C1981018 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-09-19_REVISION - C1981018 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:27 PM
Creation date
9/22/2008 1:17:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
9/19/2008
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 19, 2008 <br />Scott Wandstedt <br />Blue Mountain Energy, Inc <br />3607 County Road 65 <br />Rangely, CO 81648 <br />Re: Deserado Mine (Permit No. C-1981-018) <br />Proposed Decision <br />Permit Revision Application No. 6 (PR-6) <br />Dear Mr. Wandstedt: <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for Permit <br />Revision No. 6 at the Deserado Mine. Notice of the proposed decision will be published in the Rio Blanco Herald- <br />Times as soon as possible. The first publication will initiate the thirty (30) day public comment period for the <br />Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please be advised that federal mine plan approval needs to be obtained from the Office of Surface Mining <br />Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, is required, before <br />operations affecting federal coal may commence. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Permit Revision must not be implemented until this proposed decision <br />becomes final and until any required increase in bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Jason D. Mus`fck <br />Environmental Protection Specialist <br />JDM/Jrc <br />Enclosure(s) <br />C-PR-08 C1981018 JDM 09192008031152.doe <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.