Laserfiche WebLink
ROADABLE EQUIPMENT `::,;< ................_....._._..........................................._................_......_.............................................._..............._.........:;:::•>s <br />he2of <br />et 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $87.29 1 $87.29 $87.29 <br />-Light Duty Pickup, 4x4, 1 T. $37.28 1 $37.28 $37.28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $124.57 $124.57 <br />:::.:.:..:::.............................................................:.....:::. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 1.67 1.67 Total non-roadable mob/demob cost " <br />Return time (hours) = 1.67 1.67 * two round trips with haul rig <br />Loading time (hours) = 0.75 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = 0.75 NA one round trip, no haul rig <br />Subtotals = 4.83 3.33 <br /> <br />:::........ <br />JOB TIME AND COST .......................... ................................. .............................................. <br />......::::::.Total job time <br /> Total iob cost <br />Kremmling <br />75.0 miles <br />45.0 mph <br />$5,559.91 <br />$415.23 <br />9.66 hours <br />5.975