My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-19_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2008-09-19_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:25 PM
Creation date
9/22/2008 1:14:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/19/2008
Doc Name
Proposed Decision & Findings of Compliance for PR6
From
Add 760 Acres
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
up to 25,000 tons of coal. From this building, coal is conveyed one third of one mile to the <br />loadout area. Clean coal is then transported by rail to the Bonanza Power Plant in Vernal, Utah. <br />The rail loop and facilities within the rail loop were removed from the permit and the reclamation <br />plan with the approval of Permit Revision 04. The loadout tower remains in the permit and <br />reclamation plan, as do all of the structures that convey the coal to the rail loop. BME will keep <br />all operations related to the mining operations and the loading and transporting of coal separate. <br />Coal processing waste generated at the wash plant facility is trucked approximately 3.6 miles to <br />the refuse disposal area located east of the rail loadout in the northeast portion of the permit area. <br />The refuse disposal area includes eleven subareas of refuse deposition. The first subarea (RP-1) <br />was reclaimed in late 1990, implementing a revegetation study that involved variations from the <br />required four feet of cover. Combined Refuse Area RP-2/3/4 and the adjacent Refuse Area RP- <br />5A are currently active. The remaining subareas have not yet been developed. <br />Deserado Mine 12 September 19, 2008
The URL can be used to link to this page
Your browser does not support the video tag.