My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 9/22/2008, 9:52:23 AM-MR1
DRMS
>
Public
>
REVISION - 9/22/2008, 9:52:23 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 7:00:21 PM
Creation date
9/22/2008 9:56:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
9/16/2008
Doc Name
Request for modificaion (non-confidential)
From
Powertech (USA) Inc.
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 (Form 2- Public) <br />G. Total project area to be disturbed 2 . 6 0 5 (acres) <br />11. Describe the equipment to be used for the prospecting operations: <br />Backhoe - To excavate the mud pits. <br />..............------........ ................. --.- -- - <br />Drill Ria - To drill exploration boreholes and boreholes for <br />construction of the groundwater monitoring wells. <br />1. Describe and locate any struchires to be constructed (i.e. stockpiles, ponds, impoundments): <br />Refer to Attachment C for layout of stockpiled soils. <br />J. Describe anticipated relationship to surface water and groundwater (proximity to streams, penetration of ground <br />water aquifers): <br />SurfaceWater - Sites are located away from drainages and existing <br />surface water bodies. <br />......... .... ...--- ---..............---- <br />Groundwater - All exploration boreholes and monitoring wells will <br />_............................ ...--- -....,... --------- ......----- <br />penetrate the upper most aquifer. Permits will be obtained by the State <br />-- _.. _ ......-..._T............ <br />Engineer's Office for groundwater monitoring wells to be installed. <br />Ill. OPERATION AND RECLAMATION MEASURES: <br />i . 'Che Board suggests that a photographic record of the pre-prospecting and post-prospecting conditions be kept by the <br />prospector. These photos should be taken from the same location and by the same method to clearly show the pre-prospecting <br />condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release, the <br />Board may consider the photos as evidence of adequate reclamation, and thus, be able to act more quickly on the request for <br />release. <br />2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass communities of the <br />area. Color photographs. sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br />orientation and locations may be used in lieu oi'a written description. Based on the quality of the photographs, the Division <br />,nar- requite additional detail. <br />See Attachment D - Photographs & Descriptions of Areas to be Disturbed. <br />----------._._..........._...---........................ ..._....................... .................................................. ...................---.........._.......-,..._.............-....._._..-....................----..--------------.._................... -
The URL can be used to link to this page
Your browser does not support the video tag.