Processing Waste <br /> The mine is actively grubbing the steep slope immediately behind the Refuse Pile Expansion <br /> (RPE) in preparation to strip and live haul this soil to the outslope of the RPE. Vegetation <br /> material was being mechanically mulched and sprayed back onto the soil layer in preparation <br /> for stripping. Cover material is stockpiled on site and about three feet of cover will be applied <br /> to the outslope prior to the application of one foot of topsoil. The Division suggested using <br /> depth stakes on the outslope to indicate the required depths and to demonstrate compliance <br /> with the approved plan once reclamation of the outslope is underway. <br /> t <br /> Ili I <br /> General Mine Plan Compliance <br /> The operator is currently longwall mining in the B-seam in Panel 25 immediately east of <br /> Sylvester Gulch near the facility area. Some rockfall had occurred along a degas road in this <br /> area and was being cleared from the road. <br /> Development mining continues in the E seam with the headgate development about four <br /> crosscuts from connecting to the start room area. With completion of this development, the <br /> mine will install a new longwall system which is delivered and stored in the material storage <br /> areas in the facility area. The old longwall will be removed and sold or relocated. Each new <br /> longwall shield is two meters in width and weighs 33 tons. The longwall will have the ability <br /> to mine a minimum coal thickness of about 6 feet up to a maximum of 14 feet. <br /> 4 <br />