Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :MR-137 <br />Task description : Replace Topsoil from Stockpile to Light Use Road <br />HOURLY ;E :.:;;.;:U:P :::.;;:..... . <br />MENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />....... <br />................. <br /> <br />QUANTITIES <br />MATERIAL <br />........................................................ <br />............................... <br />.................................... <br /> <br />............................. <br /> <br />.............................. <br />Initial Swell Loose <br />volume : 443 BCY factor : 1.250 volume : 554 LCY <br /> <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.37 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 552.93 LCY/hr <br /> Adjusted fleet production : 552.93 LCY/hr <br /> <br />JOB?TIME AND .COST <br />Fleet size : 1 Dozer(s) Total job time : 1.00 Hours <br />Unit cost : $0.375 /LCY Total job cost : $208 <br />