Laserfiche WebLink
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br /> <br /> <br /> <br />..................................................... <br />....... <br />::.::::.............................................................. <br />MATERIAL <br />QUANTITIES <br /> <br /> <br />................ .. ............ <br />............................... <br /> <br /> <br />.......... . <br />....................................................................................... <br />................................................................................................... <br />Initial Swell Loose <br />volume : 665 BCY factor : 1.250 volume : 831 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.37 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 552.93 LCY/hr <br /> Adjusted fleet production : 552.93 LCY/hr <br /> <br /> <br /> <br /> <br />............... <br />::::::................ <br />JOB TIME AND COST <br /> <br /> <br />................... <br />..................... <br /> <br /> <br />............................. <br />....................... <br />....... <br /> <br /> <br />..................................................................... <br />...................................................................... <br /> <br /> <br />........................... <br />...................... <br />...... <br /> <br /> <br />............. . . <br />................................. <br />Fleet size : 1 Dozer(s) Total job time : 1.50 Hours <br />Unit cost : $0.375 /LCY Total job cost : $312 <br />