My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-25_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-07-25_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:34:58 PM
Creation date
9/17/2008 5:15:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
7/25/2008
Doc Name
Request for Assistance
From
JJD
To
MLT
Type & Sequence
TR55
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 ?O <br />Denver, Colorado 80203 C O L O R A D O <br />D I V I S I O N O F <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br />SAFETY <br />Date: July 25, 2008 Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />TO: Marcia Talvitie Ronald W. Cattany <br />Division Director <br />FROM: Joe Dudash Natural Resource Trustee <br />RE: Bowie No. 2 1VIin <br />e, Permit No. C-1996-083, Bowie Resources LLC <br />Technical Revision No. 55, Haul Road Curve No. 11 Repair, Request <br />for Assistance <br />I am requesting your assistance in the adequacy review of Technical Revision No. 55 <br />(TR-55) as it relates to engineering. In TR-55, Bowie Resources LLC is proposing to <br />realign curve number 1 l of the paved main haul road above the B-seam portal bench. The <br />project will involve reconstructing and reinforcing the cut slope above the B-seam <br />portals, building two retaining walls and a French drain, rearranging about 8,000 cubic <br />yards of cut and fill material and reconstructing and paving curve number 11 of the haul <br />road. <br />Attached is one complete copy of the TR-55 submittal. If you need any additional <br />information, please let me know. <br />TR-55 was called complete on July 24, 2008 so the Division's adequacy review letter is <br />due August 25 (since August 23 falls on a Saturday). I would appreciate it if you could <br />get your adequacy review memo back by August 20. <br />Thanks for your assistance! <br />Attachments <br />cc: Sandy Brown (without attachments) <br />c:/word/bowie2/tr5 5 memo I <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.