My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-17_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2008-09-17_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:20 PM
Creation date
9/17/2008 5:14:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REVISION
Doc Date
9/17/2008
Doc Name
Proposed Decision Letter & Forms
From
DRMS
To
New Elk Coal Company LLC
Type & Sequence
RN2
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of ? ?o_to <br />•#?? COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />? /876' 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Reclamation, Mining and Safety, in accordance with C.R.S. <br />34-33-109(7), proposes to Approve with conditions the renewal of a permit to conduct surface coal <br />mining and reclamation operations at the Lorencito Canyon Mine, Permit No. C-1996-084. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to September 2, 2008. In accordance with <br />C.R.S. 34-33-109(7)(a), the Division makes the following determinations which warrant that the <br />permit be renewed: <br />1. The terms and conditions of the valid, existing permit are being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et <br />seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to New Elk Coal Company, LLC <br />meets the requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be for a <br />term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Director ate
The URL can be used to link to this page
Your browser does not support the video tag.